Page 1 of 1

April 28 Trail Work - Trails Open

PostPosted: Sun Apr 28, 2013 2:54 pm
by Lucky Eddie
Had a good turnout for trail work with enough people power to move heavy bridges. Got the 104x bridge and 105 long bridge back in place. The 105 bridge is offset from where it was with a new bump free approach. The cyclocross bridge also got offset a little and a new trail line developed to avoid the erosion rut. Trails are open with high water routing. Use extra caution as there are still some trees and erosion obstacles to watch out for.

IMGP2093.JPG